Europa - Srbsko - Serbia / Čierna Hora -Montenegro

Tak urcite vyhlad z dialnice bude tiez pekny ked sa pojde cez usek kde su tunely a viadukty. Ale stale mzoes ist po starejc este . :slight_smile: A pritom domaci Srbi ohovria ze na odpocivadle Predejane sa dobre je. :slight_smile:

Minule tu boli otázky, čo s nájdenou bazilikou zo 4. storočia. Robili ste si srandu z barbarov, realita je ešte horšia… Jednoducho ju zasypú:


Zasypanie baziliky este neznamena jej znicenie, zasypanim ju mozu zakonzervovat a paradoxne zachranit pre dalsie generacie. Pred tym sa samozrejme vykona dokladny archeovyskum.
Nepoznam detaily, ale ak tomu je tak aj v tomto pripade a urobili to planovane, tak to ma daleko od barbarskeho spravania.

No a po zasipanej bazilike, skoncil aj stary dub ktory blokoval trasu dialnice smer jadran. Vcera ho zlikvidovali.

v noci som dorazil z GRECKA…pridam nejake foto a postrehy z vystavby dialnice SRBSKO A MACEDONSKO…

Ponuky na posledny usek Srpska kuća - Levosoje, dlzka 8km :

  1. MBA Ratko Mitrović Niskogradnja & Srbijaautoput 3.337.631.373,18 din.
  2. Construcciones Rubau 3.579.196.683,56 din.
  3. Integral Inženjering Laktaši 3.599.796.815,44 din.
  4. Planum 3.863.100.274,99 din.
  5. Energoprojekt Niskogradnja 4.349.890.779,39 din.
  6. Aktor 4.645.111.174,08 din.

Obchvat Dimitrovgradu (smer Bulharsko) sa kvoli zosuvom nedokonci toho roku, ale az v polovici buduceho. Na vacsine usekov teraz davaju cementovu stabilizaciu, v septembri by mali urobit prvu vrstvu asfaltu. Mosty su vybetonovane. Ale posledne 2 km.. robia sa este odstrely hornin.

Na posledny usek Srpska kuća - Levosoje bol vybrana domaca firma MBA Ratko Mitrović Niskogradnja & Srbijaautoput. Termin dokoncenia tohot useku je 16 mesiacov od podpisania zluvy.

Vizualizacia Ciernohorskej dialnici Bar - Boljare: youtube.com/watch?v=zLCutnhDrUM#t=150

To hlavná trasa okrem veľkých mostov a tunelov nude 3+3, tak to je sila !!!

Práce postupujú aj na úseku Belehrad - Južný Jadran. Na úseku Takovo - Preljina bol prerazený tunel Savinac (270m), Azerbajdžánci idú podľa časového harmonogramu a do konca roka má byť hotových 92% prác.

Nove terminy dokoncenia dialnicnych usekov smer Macedonsko a smer Bulharsko.
Zdroj koridorisrbije.rs

Smer Bulharsko:

Section Prosek – Crvena Reka L=22.5 km

The works are financed by the EIB. The construction is in progress.
LOT 1- Roadway and bridges: Prosek – Bancarevo tunnel

The contractors: JV Aktor and Terna. The deadline for the completion of works is 31.08.2016.
LOT 2 - Roadway and bridges: Bancarevo tunnel – Crvena Reka
The contractors: JV Aktor and Terna. The deadline for the completion of works: 31.12.2016.
LOT 3 – Bancarevo tunnel
The contractor: Subterra A.S. The deadline for the completion of works: 31.12.2015.

Section Crvena Reka - Čiflik L= 12.7 km
The works are financed by the EBRD. The construction is in progress.
The contractor: AKTOR S.A. The deadline for the completion of works: 31.12.2015.

Parallel non-commercial road Bela Palanka – Pirot (west)
The works are financed by the EBRD.
A contract has been signed with the contractor Trace Group Hold plc. The deadline for the completion of works: 30.04.2016.

Section Čiflik – Staničenje L= 12.07 km
The works are financed by the EIB.
A contract has been signed with the contractor Construcciones Rubau. The deadline for the completion of works: 25.12.2016.

Section Staničenje – Pirot east L= 16.64 km
The works are financed by the EIB.
A contract has been signed with the contractor Aktor S.A. The deadline for the completion of works: 30.12.2016.

Section Pirot east – Dimitrovgrad L= 14.3 km
Contractor - Alpine Bau GmbH - terminated contract.
A contract has been signed with the contractor Trace Group Hold plc. The deadline for the completion of works: 17.06.2016.

LOT 1 Pirot east – Sukovo
LOT 2 Sukovo – Dimitrovgrad

Section Dimitrovgrad Bypass L= 8.6 km
The works are financed by the World Bank. The construction is in progress.
The contract for LOT 1 and LOT 2 has been awarded to Alpine Bau GmbH - terminated contract.
A contract has been signed with the contractor Trace Group Hold plc. The deadline for the completion of works: 17.06.2016.

LOT 1 – Roadway
LOT 2 – Bridges
LOT 3 – Progon tunnel and Pržojna Padina
The construction is in progress. The contractor: Terna S.A. The deadline for the completion of works: 31.12.2015.

Smer Macedonsko:

Section Grabovnica – Grdelica, L=5.6 km

The works on this section are financed by the World Bank. The construction is in progress.
The contractor: Terna S.A. The deadline for the completion of works: 31.05.2016.

Section Grdelica – Caričina dolina, L= 11.8 km

The works are financed by the EIB.
LOT 1 - Roadway and bridges Gornje polje – Predejane tunnel. A contract has been signed with the contractors JV AZVI SA & TADDEI SpA. The deadline for the completion of works: 05.09.2016.

LOT 2 - Roadway and bridges Predejane tunnel – Caričina Dolina: contracts have been signed with the contractors: JV Trace group hold plc and Mostovik llc (Bulgaria). The deadline for the completion of works: 05.09.2016.
LOT 3 - Predejane tunnel. Contracts have been signed with the contractor: Consortium Alliance X (ADVAL JSC and Road & Bridges ltd) - Bulgaria. The deadline for the completion of works: 05.09.2016.

Section Caričina dolina – Vladičin han, L= 14.3km
The works are financed by the EIB.
LOT 4 – Manajle tunnel: a contract has been signed with the contractor Consortium Alliance X (ADVAL JSC and Road & Bridges ltd) - Bulgaria. The deadline for the completion of works: 05.09.2016.
LOT 5 - Roadway and bridges Caričina Dolina – Manajle tunnel: a contract has been signed with the contractors ЈВ: Integral Inženjering, Prijedor putevi. The deadline for the completion of works: 05.09.2016.
LOT 6 - Roadway and bridges Manajle tunnel – Vladičin Han. A contract has been signed to JV Azvi, Construcciones Rubau. The deadline for the completion of works: 09.04.2017.

Section Vladičin han – Donji Neradovac, L= 26.3 km
The works on this section are financed by the World Bank. The construction is in progress.
Contractor: Terna S.A.
LOT 1 - Roadway and bridges Vladičin han – Prevalac 10.1km. The deadline for the completion of works: 30.11.2015.
LOT 2 – Roadway and bridges Prevalac – Suvi Dol - 9 km. The deadline for the completion of works: 30.11.2015.
LOT 3 - Roadway and bridges Suvi Dol - Donji Neradovac – 7.2 km. The deadline for the completion of works: 30.11.2015.

Section Donji Neradovac - Levosoje, L= 16 km
The works are financed by the Republic of Serbia and the Republic of Greece (HiPERB plan).
LOT 2 - Donji Neradovac – Srpska kuća, L= 8 km, the contract has been awarded to Aktor S.A. The section was opened for traffic on 14.11.2013.
LOT 1 – Srpska Kuća - Levosoje, L= 8 km; the contract has been awarded to ‘‘MBA Ratko Mitrović’’ and ‘‘Srbijaautoput’’. The deadline for the completion of works: 21.12.2016.

17.10. Koridori Srbije (naša NDS) ukončili zmluvu s Trace Group na obchvate Dimitrovgradu. Po tom čo tam skrachoval Alpine už druhá firma, čo tento úsek nedokončí. Dôvodom ukončenia zmluvy bolo to, že zrealizovali len 13% prác a termín odovzdania majú v júni 2016.

Úsek Vladičin Han - Donji Neradovac (26,3 km), ktorý by mal byť hotový do konca mesiaca je vo finálnej fáze, dokončujú sa už len protihlukové steny. Južná vetva koridoru 10 sa tak kompletizuje postupne. Ostane už len 40 km rozostavaných diaľníc, ktoré by sa mali odovzdávať budúci rok.

Vyborna sprava pre nas čo chodime do Grecka autom cez SRBSKO A MACEDONSKO…

Vcera otvorili usek Vladičin han – Donji Neradovac, dlhy 26.3 km.

Dole pod článkom pár fotiek:
tanjug.rs/full-view1.aspx?izb=216444
Zároveň premiér informoval, že kompletný koridor smerom ako na BG tak na MK bude najneskôr v marci 2017.

dakujeme za vyborne spravy Ivanisevic…zase pojdem tento usek SVK-GRECKO o 25 min kratšie k moru… :slight_smile:

niekolko info ohladom myta v Srbsku.

Platenie myta po Sirig (Novy Sad - Belehrad) uzavreli 15.11.2015. Co pre tranzitujucich znamena usporu 2,5€ na jazdu. Dalsie rozsirenie myta v uzavretom systeme je planovane smerom na sever (Subotica) ako aj na juh, ale az po kompletnom dobudovani koridora.

Do leta by chceli presunut mytnicu Bubajn Potok do novej polohy a rozsirit, co by malo odstranit problematicke kolony. Mytnica by mala mat az 26 miest, co je takmer dvojnasobok oproti sucastnemu stavu. Nakolko na mieste aktualnej mytnice sa pocita s vystavbou obchodneho centra, predpokladam, ze v tomto pripade k velkemu zdrzaniu nedojde.

Aktualny cennik myta
putevi-srbije.rs/images/pdf/ … na_eng.pdf

V Srbsku otvorili koncom roka 12,7 km dlhý úsek Crvena Reka – Čiflik v Smere na Sofiu, je už aj v googlemaps zakreselené.

Toho roku by sa malo strihať mnoho pások v smere na Sofiu:
Prosek - Crvena Reka L=22,5 km v decembri
Čiflik – Staničenje L= 12,07 km v decembri
Staničenje – Pirot L= 16,64 km v decembri
Pirot – Dimitrovgrad L= 14,3 km v júni

Taktiež v smere na juh by sa malo otvárať:
Grabovnica – Grdelica, L=5,6 km v Máji (mám ale obavu, že sa nestihne)
Grdelica – Caričina Dolina, L= 11,8 km v septembri
Srpska Kuća – Levosoje, L= 8 km v decembri

Zároveň by sa v Smere do ČIernej Hory malo toho roku otvárať:
Ljig – Preljina L=40,36 km v auguste