# D3 Oščadnica – Čadca, Bukov | tunel Horelica

**URL:** <https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254>\
**Category:** Diaľnice a rýchlostné cesty\
**Tags:** D3\
**Created:** [Február 18, 2005, 11:47pm UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254 "2005-02-18T23:47:31Z")\
**Posts on this page:** 20\
**Page:** 17

<div class="post-metadata">

**Author:** ![Miro1](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/m/a183cd/32.png) [@Miro1](https://infrastruktura.sk/u/Miro1)\
**Post date:** [August 8, 2025, 8:42am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/321 "2025-08-08T08:42:57Z")

</div>

Ozaj, a to musia tie mostné uzávery meniť tak dlho?

---

<div class="post-metadata">

**Author:** ![LuTe](https://infrastruktura.sk/user_avatar/infrastruktura.sk/lute/32/48550_2.png) [@LuTe](https://infrastruktura.sk/u/LuTe)\
**Post date:** [August 8, 2025, 9:13am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/322 "2025-08-08T09:13:05Z")

</div>

> [@Súťaž na výstavbu úseku D3 medzi Čadcou a Oščadnicou sa skončila. Napĺňame prísľub Kysučanom, vyhlásil Ráž](https://infrastruktura.sk/t/sutaz-na-vystavbu-useku-d3-medzi-cadcou-a-oscadnicou-sa-skoncila-naplname-prislub-kysucanom-vyhlasil-raz/28496):
>
> [[TASR]TASR](https://hnonline.sk/autor/tasr-5963) Verejné obstarávanie je ukončené, keďže Úrad pre verejné obstarávanie zamietol námietku neúspešného uchádzača a potvrdil tak výsledok tendra. Súťaž na výstavbu úseku diaľnice D3 Oščadnica - Čadca, Bukov sa definitívne skončila. Severný úsek kysuckej D3 postaví Združenie Ošč-Ča, v ktorom popri Váhostave figurujú Metrostav DS a maďarská firma Duna Aszfalt. Úsek postaví združenie za 230 miliónov eur bez DPH, informoval odbor komunikácie Ministerstva dopravy. „Keďže predpokladaná hodno…

🙂 🙂 🙂

---

<div class="post-metadata">

**Author:** ![LuTe](https://infrastruktura.sk/user_avatar/infrastruktura.sk/lute/32/48550_2.png) [@LuTe](https://infrastruktura.sk/u/LuTe)\
**Post date:** [August 8, 2025, 9:15am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/323 "2025-08-08T09:15:54Z")

</div>

![image](https://infrastruktura.sk/uploads/default/original/3X/6/6/6600f0765c5377e63826a9e089242625df22ab3b.png)

---

<div class="post-metadata">

**Author:** ![pa3ck](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/p/f4b2a3/32.png) [@pa3ck](https://infrastruktura.sk/u/pa3ck)\
**Post date:** [August 8, 2025, 9:17am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/324 "2025-08-08T09:17:12Z")

</div>

> Severný úsek kysuckej D3 postaví Združenie Ošč-Ča

Nejaká ta [ošča](https://narecie.sk/o%25C5%25A1%25C4%258Da) by sa mohla rozdávať vodičom stojacim v kolónach počas výstavby 😁

---

<div class="post-metadata">

**Author:** ![mato-e](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/m/9e8a1a/32.png) [@mato-e](https://infrastruktura.sk/u/mato-e)\
**Post date:** [August 8, 2025, 4:04pm UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/325 "2025-08-08T16:04:21Z")

</div>

[![](https://img.youtube.com/vi/2xNqR5OBJbY/maxresdefault.jpg "UKONČILI SME OBSTARÁVANIE ĎALŠIEHO ÚSEKU D3 #kysuce #dialnice #d3 #cadca #oscadnica") ](https://www.youtube.com/watch?v=2xNqR5OBJbY)

ak uz niekto pridal tak to zmazem

---

<div class="post-metadata">

**Author:** ![traveller](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/t/71c47a/32.png) [@traveller](https://infrastruktura.sk/u/traveller)\
**Post date:** [August 9, 2025, 2:58am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/326 "2025-08-09T02:58:18Z")

</div>

takto sa to robi do psej matere! 🙂 neopodstatnena namietka,problem? zamietnut! a kratky proces! ved oni si casom odvyknu toto robit.. cize uz len prvy usek dat druhemu v poradi strabagu +doprastavu s euroviou s takmer totoznou cenou ako vitaz (kedze prvy dostal definitivne usek cadca oscadnica) aby boli pekne useky prerozdelene rovnomerne a spravodlivo medzi vsetky firmy a bude konecne to nekonecne natahovanie u konca! snad uz ta kalvaria brzo skonci.. ja by som na mieste MD zacal riesit a nakopol z PPP konecne pokracovanie R4 kapusany lipniky a pokracovanie na sever na svidnik ,nakolko tieto kysucke useky su definitivne posledne useky D+RC hradene z eu, v buducnosti budu dotovat uz len zeleznice a cyklotrasy

---

<div class="post-metadata">

**Author:** ![LuTe](https://infrastruktura.sk/user_avatar/infrastruktura.sk/lute/32/48550_2.png) [@LuTe](https://infrastruktura.sk/u/LuTe)\
**Post date:** [August 19, 2025, 4:52am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/327 "2025-08-19T04:52:53Z")

</div>

Takže ten pomyslený šampus strieľame 30. Septembra.

A idem si nakúpiť veľké zásoby “Oščí” bo 3,5 (Horelica 4,5) roka sa tam nikdo nikam ponáhľať …. nebude 🙂

---

<div class="post-metadata">

**Author:** ![yoggy](https://infrastruktura.sk/user_avatar/infrastruktura.sk/yoggy/32/110_2.png) [@yoggy](https://infrastruktura.sk/u/yoggy)\
**Post date:** [August 26, 2025, 8:06am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/328 "2025-08-26T08:06:12Z")

</div>

18 príspevky boli zlúčené do existujúcej témy: [Regionálne rozdiely a infraštruktúra vyššieho rádu](https://infrastruktura.sk/t/regionalne-rozdiely-a-infrastruktura-vyssieho-radu/489/6743)

---

<div class="post-metadata">

**Author:** ![mato-e](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/m/9e8a1a/32.png) [@mato-e](https://infrastruktura.sk/u/mato-e)\
**Post date:** [December 15, 2025, 3:55pm UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/329 "2025-12-15T15:55:15Z")

</div>

> [Facebook Post](https://www.facebook.com/mindop.sk/videos/1636311071083224/)

![](https://img.youtube.com/vi/c8Aw4KX513U/maxresdefault.jpg)https://www.youtube.com/embed/c8Aw4KX513U?feature=oembed&wmode=opaque

---

<div class="post-metadata">

**Author:** ![DrX](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/d/e8c25b/32.png) [@DrX](https://infrastruktura.sk/u/DrX)\
**Post date:** [December 15, 2025, 8:23pm UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/330 "2025-12-15T20:23:54Z")

</div>

Skutocna nehoraznost…

---

<div class="post-metadata">

**Author:** ![FYI2023](https://infrastruktura.sk/user_avatar/infrastruktura.sk/fyi2023/32/49396_2.png) [@FYI2023](https://infrastruktura.sk/u/FYI2023)\
**Post date:** [December 16, 2025, 11:12am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/331 "2025-12-16T11:12:05Z")

</div>

Týchto pár domov tam nebude vadiť alebo budú mať most pod hlavami?

 ![Bez názvu](https://infrastruktura.sk/uploads/default/original/3X/2/7/2710056fe48bd903aaf3c8d83a6129050b81182e.jpeg)

---

<div class="post-metadata">

**Author:** ![110mat110](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/1/ccd318/32.png) [@110mat110](https://infrastruktura.sk/u/110mat110)\
**Post date:** [December 16, 2025, 11:16am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/332 "2025-12-16T11:16:58Z")

</div>

Tie by mali ist dole

---

<div class="post-metadata">

**Author:** ![rempo](https://infrastruktura.sk/user_avatar/infrastruktura.sk/rempo/32/49378_2.png) [@rempo](https://infrastruktura.sk/u/rempo)\
**Post date:** [Máj 18, 2026, 7:06am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/333 "2026-05-18T07:06:58Z")

</div>

![DJI_0382](https://infrastruktura.sk/uploads/default/original/3X/8/0/806fdf3c59d187a387c0890b5eaebac600384128.jpeg)  
 ![DJI_0383](https://infrastruktura.sk/uploads/default/original/3X/0/c/0c0ab341dcc2ea087c326159b0f588a788b7bb4d.jpeg)  
 ![DJI_0384](https://infrastruktura.sk/uploads/default/original/3X/d/5/d5d0d5bcb9d59f12bb2c76069d50527615a7d5d4.jpeg)  
 ![DJI_0385](https://infrastruktura.sk/uploads/default/original/3X/2/e/2e1cca4019927e89fdaee237464fc1173562dad7.jpeg)  
 ![DJI_0386](https://infrastruktura.sk/uploads/default/original/3X/a/4/a439b0f1007b4f2b1001166833f45db761170b36.jpeg)  
 ![DJI_0387](https://infrastruktura.sk/uploads/default/original/3X/0/a/0aa4cac89274c01a6d0d146b92a20f3b1b2b66ef.jpeg)  
 ![DJI_0388](https://infrastruktura.sk/uploads/default/original/3X/1/8/180a947a7341d025f22362f25c1197d57da1bc8e.jpeg)  
 ![DJI_0389](https://infrastruktura.sk/uploads/default/original/3X/e/1/e1d15e151f106a3a7ab0956ef9777fd62344a6f1.jpeg)  
 ![DJI_0390](https://infrastruktura.sk/uploads/default/original/3X/d/0/d0f338b0654b9c00f4e6817b1599b7ac88c73fb0.jpeg)

---

<div class="post-metadata">

**Author:** ![rempo](https://infrastruktura.sk/user_avatar/infrastruktura.sk/rempo/32/49378_2.png) [@rempo](https://infrastruktura.sk/u/rempo)\
**Post date:** [Máj 18, 2026, 7:08am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/334 "2026-05-18T07:08:41Z")

</div>

![DJI_0391](https://infrastruktura.sk/uploads/default/original/3X/5/6/56c6cd317842df4cb15ee04d1a514462ec07df2b.jpeg)

 ![DJI_0392](https://infrastruktura.sk/uploads/default/original/3X/e/4/e4f272d646fffba075a2c93bde95d0cab2f6eac9.jpeg)  
 ![DJI_0393](https://infrastruktura.sk/uploads/default/original/3X/1/5/15db2895024649be81cb5240facb1c804bb6a0db.jpeg)  
 ![DJI_0394](https://infrastruktura.sk/uploads/default/original/3X/d/2/d239bc33dc61fd21016703f9d78cd447ce65e723.jpeg)  
 ![DJI_0395](https://infrastruktura.sk/uploads/default/original/3X/4/7/479559d0c704069134fafca85b2f410fdeebb9d8.jpeg)  
 ![DJI_0396](https://infrastruktura.sk/uploads/default/original/3X/6/3/6360dfa14729590c6da5b6e89e0e4e1c03f786de.jpeg)

 ![DJI_0397](https://infrastruktura.sk/uploads/default/original/3X/6/1/611f48f4ed897968de5bd3047f7d88e3dab3de18.jpeg)  
 ![DJI_0398](https://infrastruktura.sk/uploads/default/original/3X/f/e/fe446f0c5b0e57459ce04695f9a0e958d12ea0e4.jpeg)  
 ![DJI_0399](https://infrastruktura.sk/uploads/default/original/3X/8/c/8c48c3aac101ac79522ceb7442c1d87aebc67c0f.jpeg)  
 ![DJI_0400](https://infrastruktura.sk/uploads/default/original/3X/6/2/62728d252de4b2f84550124885b80ca8152685f2.jpeg)  
 ![DJI_0401](https://infrastruktura.sk/uploads/default/original/3X/2/7/27ecbc1b5d186232d01ffd4c795912d5b7fed7e3.jpeg)

---

<div class="post-metadata">

**Author:** ![rempo](https://infrastruktura.sk/user_avatar/infrastruktura.sk/rempo/32/49378_2.png) [@rempo](https://infrastruktura.sk/u/rempo)\
**Post date:** [Máj 18, 2026, 7:11am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/335 "2026-05-18T07:11:35Z")

</div>

![DJI_0402](https://infrastruktura.sk/uploads/default/original/3X/0/b/0b997009f1a997f1cb05dca8e41642dddecc4d6a.jpeg)  
 ![DJI_0403](https://infrastruktura.sk/uploads/default/original/3X/8/3/83c882ae2cf38acbc3ca3d43f84d26a10ec07501.jpeg)  
 ![DJI_0404](https://infrastruktura.sk/uploads/default/original/3X/c/2/c2c5abb47b13d4c5d503eefae542fa8b930ba522.jpeg)  
 ![DJI_0405](https://infrastruktura.sk/uploads/default/original/3X/c/c/cc531aac3d301c714adc9bc5ec08fa18a4dfff3b.jpeg)  
 ![DJI_0406](https://infrastruktura.sk/uploads/default/original/3X/2/f/2f5daad392009ad373dfc16cb3671b856bcccb3d.jpeg)  
 ![DJI_0407](https://infrastruktura.sk/uploads/default/original/3X/0/f/0f9ee890b5125ca7e286f2700edf1c159e3b40ef.jpeg)  
 ![DJI_0408](https://infrastruktura.sk/uploads/default/original/3X/7/e/7e0ec3ec8fc4878da7649fbef918aa5891159cb0.jpeg)  
 ![DJI_0409](https://infrastruktura.sk/uploads/default/original/3X/3/7/3776c3b4203386d1f44526525e8e3d84b6fe8817.jpeg)  
 ![DJI_0410](https://infrastruktura.sk/uploads/default/original/3X/a/d/ada388514ec240b06fe6245d0267566b67f06282.jpeg)  
 ![DJI_0411](https://infrastruktura.sk/uploads/default/original/3X/5/1/519c0101ea412441e904068dddb31871c207c981.jpeg)

---

<div class="post-metadata">

**Author:** ![rempo](https://infrastruktura.sk/user_avatar/infrastruktura.sk/rempo/32/49378_2.png) [@rempo](https://infrastruktura.sk/u/rempo)\
**Post date:** [Máj 18, 2026, 7:12am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/336 "2026-05-18T07:12:42Z")

</div>

![DJI_0413](https://infrastruktura.sk/uploads/default/original/3X/0/9/094521487a40ce9fde86bc39d4a57bbc2afb5c6b.jpeg)  
 ![DJI_0414](https://infrastruktura.sk/uploads/default/original/3X/5/7/572c9055691bbff26f8f454d8327c541c34a9612.jpeg)  
 ![DJI_0415](https://infrastruktura.sk/uploads/default/original/3X/c/0/c055f06647d760bf58fcdc7dca0d3cd542279296.jpeg)  
 ![DJI_0416](https://infrastruktura.sk/uploads/default/original/3X/1/1/11569d19e97571c844f18b86456741a9d137258e.jpeg)  
 ![DJI_0417](https://infrastruktura.sk/uploads/default/original/3X/2/d/2d28d95001c4f3b3b3ee12e01d6fca0d5b816c6f.jpeg)  
 ![DJI_0418](https://infrastruktura.sk/uploads/default/original/3X/d/4/d47f1a2630a6a5ade6b9ef80c04fdc68b0eefeb8.jpeg)  
 ![DJI_0420](https://infrastruktura.sk/uploads/default/original/3X/0/6/06dd0edce0eee6b04f4f3c7f12ed9fcb0b251e8a.jpeg)  
 ![DJI_0422](https://infrastruktura.sk/uploads/default/original/3X/a/8/a8ad08720b8a674ed4a616b99b5fe065d3437639.jpeg)  
 ![DJI_0423](https://infrastruktura.sk/uploads/default/original/3X/2/1/210dab12c2b974f0b4da3be65368210f4218f526.jpeg)  
 ![DJI_0424](https://infrastruktura.sk/uploads/default/original/3X/2/7/27e15d141b7336a0425e18f37930cb7f6c084fbe.jpeg)

---

<div class="post-metadata">

**Author:** ![rempo](https://infrastruktura.sk/user_avatar/infrastruktura.sk/rempo/32/49378_2.png) [@rempo](https://infrastruktura.sk/u/rempo)\
**Post date:** [Máj 18, 2026, 7:14am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/337 "2026-05-18T07:14:09Z")

</div>

![DJI_0425](https://infrastruktura.sk/uploads/default/original/3X/8/9/8937a17788e488ea57d69c583dfde4c9edc52997.jpeg)  
 ![DJI_0426](https://infrastruktura.sk/uploads/default/original/3X/0/e/0e3bebe91539c5b38a2e22e77bb26dd3b4fe6165.jpeg)  
 ![DJI_0427](https://infrastruktura.sk/uploads/default/original/3X/4/2/426c980a82862aab41fd48daaff2b300b98e2b12.jpeg)  
 ![DJI_0428](https://infrastruktura.sk/uploads/default/original/3X/d/5/d5a5c7ddfba1eacb6280188c396b7f4b57724080.jpeg)  
 ![DJI_0429](https://infrastruktura.sk/uploads/default/original/3X/d/6/d616625ab6849d8ae914a54142a9c956e2336a0c.jpeg)  
 ![DJI_0431](https://infrastruktura.sk/uploads/default/original/3X/f/4/f40a7ae0180f8eaa26a9c0474fa05a16dfc97ce9.jpeg)  
 ![DJI_0432](https://infrastruktura.sk/uploads/default/original/3X/2/4/24c088c02f41c2f992796e2681cdf513bd04e385.jpeg)

---

<div class="post-metadata">

**Author:** ![potmehudak](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/p/49beb7/32.png) [@potmehudak](https://infrastruktura.sk/u/potmehudak)\
**Post date:** [Máj 18, 2026, 12:56pm UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/338 "2026-05-18T12:56:42Z")

</div>

Ako sa to bude riesit tesne pred tunelom z juznej strany, aby sa im ten kopec cely nezosunul na existujucu dialnicu pocas vystavby? Tam to vyzera na riadne hlboky zarez s uz existujucimi opornymi murmi, ktore bude treba vyhodit.

---

<div class="post-metadata">

**Author:** ![LuTe](https://infrastruktura.sk/user_avatar/infrastruktura.sk/lute/32/48550_2.png) [@LuTe](https://infrastruktura.sk/u/LuTe)\
**Post date:** [Máj 19, 2026, 4:51am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/339 "2026-05-19T04:51:52Z")

</div>

Ak myslíš tento:

 ![image](https://infrastruktura.sk/uploads/default/original/3X/f/0/f0ca02d246b1f5f722d8b93f34bfff900a4a2ee3.png)

tak ten sa už tlaćí dole aj sám 🙂

 ![image](https://infrastruktura.sk/uploads/default/original/3X/d/d/ddbd38cc79d541daaf4f3e40bd85a33a3e634baa.jpeg)

 ![image](https://infrastruktura.sk/uploads/default/original/3X/0/2/02e3048a61e67b0fbaca947f90f29993bffff3d1.jpeg)

No a podľa projektu vraj pôjde o najväčší zárez u nás vôbec. Ale neviem či je to pravda.

---

<div class="post-metadata">

**Author:** ![110mat110](https://infrastruktura.sk/letter_avatar_proxy/v4/letter/1/ccd318/32.png) [@110mat110](https://infrastruktura.sk/u/110mat110)\
**Post date:** [Máj 19, 2026, 5:52am UTC](https://infrastruktura.sk/t/d3-oscadnica-cadca-bukov-tunel-horelica/254/340 "2026-05-19T05:52:38Z")

</div>

> [@potmehudak](#):
>
> Ako sa to bude riesit tesne pred tunelom z juznej strany, aby sa im ten kopec cely nezosunul na existujucu dialnicu pocas vystavby? Tam to vyzera na riadne hlboky zarez s uz existujucimi opornymi murmi, ktore bude treba vyhodit.

https://www.google.com/maps/embed?pb=%213m2%212sen%214v0%216m8%211m7%211sgxoZCVprpHrjncsQ8MuCiA%212m2%211d49.4273586%212d18.8160276%213f347.01%214f10.516%215f0.9

Toto? Ak si dobre pamatam z vizualizacii, tak novy pruh pojde kusok vyssie ako aktualna cesta. Podlozie vyzera, ze ma aj nejaky kamen v sebe, tak snad to bude drzat. Idealne by bolo, keby rovno zburali a na novo postavili aj aktualny most, lebo ten je vo velmi smutnom stave.